Terra Technologies Sun Logo    Terra Technologies
Engineers                               Scientists                    Permit Specialists

Featured Projects (Click to View):
Lakeside 370 Project Button
Calwood Stormwater Improvements Project Button

Wetland & Stream Mitigation Bank Page

Stream PicturePrairie RestorationWetland Photo
           Press Releases Button                  Projects In Construction Button         

Our Services

Permitting Services Button Wetland & Stream Mitigation Bank Services Button Biotechnical Engineering Services Button Low Impact Development Services Habitat Restoration Services Button SWPPP Inspection Services Button Biological Analyses Services Button Home Button

 

About Us

Senior Staff QualificationsEmployment ButtonContact Us Button

Press Release:

Terra Technologies Completes Design/Build Bioengineered Streambank Improvements In Independence, Missouri In The Vicinity Of 31st and Norton.


May 17, 2010

David Flick, Principal and Founder, announces the completion of design/build bioengineered streambank improvements in Independence, Missouri in the vicinity of 31 st and Norton. In 2009, a utility line maintenance contractor used herbicide to eradicate brushy vegetation under aerial power lines at the site. The herbicide killed all vegetation, resulting in mass slumping of stream banks.

Scientists and engineers at the firm designed a double stack gabion toe wall at the rear of adjoining residential lots in order to re-establish usable back yards and correct lateral bank instability. Native plantings of Ninebark (Physocarpus opulifolius) were planted atop the toe walls, and turf grass was re-established in the adjacent lawns. The project was constructed in 5 days.

 

 

 

TERRA TECHNOLOGIES, INC.

4707 West 135 th Street, Suite 280 · Leawood, KS 66224

Phone: 913.385.9560 • Fax: 913.385.5295

Website: www.terratechnologies.com

e-mail: terratech@terratechnologies.com

 

 

 

 

 

 

 

© 2005-2011, Terra Technologies, Inc. All Rights Reserved.